Normal view

What is the required level of noncontingency temporary duty for Air Force personnel? / Lawrence M. Hanser, Maren Leed, Marc N. Elliott.

By: Contributor(s): Material type: TextTextSeries: Documented briefing (Rand Corporation) ; DB-367-AF.Publisher: Santa Monica, Calif. : RAND, 2003Description: ix, 55 pages : illustrations ; 28 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
ISBN:
  • 0833033166 (pbk)
Subject(s): LOC classification:
  • UG638 H36 2003
Action note:
  • cat 20030502 llb
  • cat 20030502 llb
Summary: Following the Gulf War, the U.S. Air Force placed a 120-day-per-year ceiling on temporary duty (TDY) both for contingency operations and for non-contingency-related activities, including training courses and exercises. Questions have arisen, however, regarding the extent to which these competing demands for TDY may be adversely affecting Air Force training activities. Accordingly, the authors seek to ascertain the magnitude of noncontingency TDY that the Air Force needs to maintain requisite levels of training and readiness. Toward this end, they examined the accuracy of current Air Force TDY data, as captured in the Air Force Personnel Center's TDY History File, with data on TDY that individuals have actually performed. They also interviewed more than 40 squadron commanders, to determine whether contingency operations had indeed taken a toll on non-contingency-related efforts. The authors conclude that widespread errors do exist in the recording of TDY, with many such errors attributable to miscategorizations or to missing data. Interviews further revealed that more than half of all squadron commanders felt that noncontingency TDY levels were in fact too low. On the basis of these findings, the authors recommend that the Air Force's TDY tracking system be improved and that the burden of TDY for contingency operations be reduced.
Holdings
Item type Current library Call number Copy number Status Date due Barcode Item holds
Book Book UAE Federation Library | مكتبة اتحاد الإمارات General Collection | المجموعات العامة UG638 H36 2003 (Browse shelf(Opens below)) C.1 Library Use Only | داخل المكتبة فقط 30010000255030
Total holds: 0

"Prepared for the United States Air Force."

"Project AIR FORCE."

Includes bibliographical references (pages 55).

cat 20030502 llb UPB

cat 20030502 llb UPB

Following the Gulf War, the U.S. Air Force placed a 120-day-per-year ceiling on temporary duty (TDY) both for contingency operations and for non-contingency-related activities, including training courses and exercises. Questions have arisen, however, regarding the extent to which these competing demands for TDY may be adversely affecting Air Force training activities. Accordingly, the authors seek to ascertain the magnitude of noncontingency TDY that the Air Force needs to maintain requisite levels of training and readiness. Toward this end, they examined the accuracy of current Air Force TDY data, as captured in the Air Force Personnel Center's TDY History File, with data on TDY that individuals have actually performed. They also interviewed more than 40 squadron commanders, to determine whether contingency operations had indeed taken a toll on non-contingency-related efforts. The authors conclude that widespread errors do exist in the recording of TDY, with many such errors attributable to miscategorizations or to missing data. Interviews further revealed that more than half of all squadron commanders felt that noncontingency TDY levels were in fact too low. On the basis of these findings, the authors recommend that the Air Force's TDY tracking system be improved and that the burden of TDY for contingency operations be reduced.

Share

Abu Dhabi, United Arab Emirates

reference@ecssr.ae

+97124044780

Copyright © 2026 Emirates Center for Strategic Studies and Research All Rights Reserved