Sustaining U.S. nuclear submarine design capabilities / John F. Schank ... [and others].

المساهم (المساهمين):نوع المادة : نصنصالناشر:Santa Monica, CA : RAND Corporation, 2007وصف:xxxii, 201 pages : illustrations ; 23 cmنوع المحتوى:
  • text
نوع الوسائط:
  • unmediated
نوع الناقل:
  • volume
تدمك:
  • 9780833041609 (pbk.)
  • 0833041606 (pbk.)
الموضوع:تصنيف مكتبة الكونجرس:
  • V858 S87 2007
موارد على الانترنت:
المحتويات:
Introduction -- The submarine design process -- Framing the analysis -- Effect of different options for managing design resources -- Critical skills -- Suppliers -- The Navy's roles and responsibilities in submarine design -- Effect of a design gap on the Navy's technical community -- Conclusions and recommendations -- Appendixes: A. Workforce simulation model -- B. Survey instrument for electric boat and Northrop Grumman Newport news -- C. Survey instrument provided to vendors -- D. U.S. Navy's technical warrant holders -- E. Net present value analysis.
ملخص:For the first time since the design of the first nuclear submarine, the U.S. Navy has no nuclear design program under way, which raises the possibility that design capability could be lost. Such a loss could result in higher costs and delays when the next submarine design is undertaken, as well as risks to system performance and safety. The authors estimate and compare the costs and delays of letting design capability erode vs. those of alternative means of managing the workload and workforce over the gap in design demand and beyond. The authors recommend that the Navy consider stretching out the deign of the next submarine class and starting it early, or,if that seems too risky, sustaining design resources that the shipyards, their vendors, and in the Navy itself that exceed those supported by the demand.
المقتنيات
نوع المادة المكتبة الحالية رقم الطلب رقم النسخة حالة تاريخ الإستحقاق الباركود
كتاب كتاب UAE Federation Library | مكتبة اتحاد الإمارات General Collection | المجموعات العامة V858 S87 2007 (إستعراض الرف(يفتح أدناه)) C.1 Library Use Only | داخل المكتبة فقط 30010000301581

Includes bibliographical references (pages 199-201).

Introduction -- The submarine design process -- Framing the analysis -- Effect of different options for managing design resources -- Critical skills -- Suppliers -- The Navy's roles and responsibilities in submarine design -- Effect of a design gap on the Navy's technical community -- Conclusions and recommendations -- Appendixes: A. Workforce simulation model -- B. Survey instrument for electric boat and Northrop Grumman Newport news -- C. Survey instrument provided to vendors -- D. U.S. Navy's technical warrant holders -- E. Net present value analysis.

For the first time since the design of the first nuclear submarine, the U.S. Navy has no nuclear design program under way, which raises the possibility that design capability could be lost. Such a loss could result in higher costs and delays when the next submarine design is undertaken, as well as risks to system performance and safety. The authors estimate and compare the costs and delays of letting design capability erode vs. those of alternative means of managing the workload and workforce over the gap in design demand and beyond. The authors recommend that the Navy consider stretching out the deign of the next submarine class and starting it early, or,if that seems too risky, sustaining design resources that the shipyards, their vendors, and in the Navy itself that exceed those supported by the demand.